Site: London

We arrived at this Primary School as they were having issues with an unlevel playground areas due to tree roots. 

We barriered off the area for safe working and lifted the unlevel slabs.  We removed the tree roots and levelled the ground, using re-mix we then re-installed the paving slabs.  We then had to ensure the slabs were level and fully secured.  We left this Primary School clean and tidy upon completion.

Sub Total Cost: £10k

TOP