Site: London

We attended site out of hours with a two-man team to complete this shower replacement.  We supplied and transported all materials to a secure location on site close to the work area and barriered off the area for safe working.

Firstly, we isolated the water supply to the showers.  Our team then removed the old shower and mixer taps from the wall, removed the old shower cubicle doors and screens along with the old wall tiles.  We removed the old flooring and installed new aqua panels to the wall area, sealing the joints with aqua panel joint adhesive, followed by primer for maximum adhesion.

We installed new 75mm x 300mm white gloss ceramic wall tiles to the shower room and grouted the area.  A new quadro thermostative bar mixer shower with a rigid riser and fixed head was installed with a new bi-fold cubicle door.

Our engineers prepped the sub floor ready for new non slip flooring and installed cove formers for upstands.  We applied adhesive and installed new non slip vinyl flooring with a 100mm upstand.  We then installed a new capping strip to the altro.

We then removed all the barriers; site was left clean and tidy upon completion of works.

Sub Total Cost: £25k