We attended site with a three-man team to replace a large area of carpet tiles and wall tiles.

We barriered off the working area with signage for safe working and uplifted and disposed of 1954 m2 of carpet tiles. We cleaned the remaining adhesive from the floor and our team then applied new adhesive and supplied and installed new carpet tiles. We then removed 13m2 of wall tiles and re-tiled with new beige tiles as requested by the client. All associated waste was removed along with the barriers and safety signage.

Sub Total Cost: £42 000