Trading Estate, Kent, Pump replacements

Our engineers attended site and lifted the chamber lids, isolated the electrics and wired in new pumps and tested them for rotation.  We installed new chains to both pumps and lowered into the chamber.  We tested the pumps and they were found to be operating correctly.  We also removed 4 old floats and replaced with new and fitted a new high-level beacon to kiosk.

TOP